Recently, Jiangsu Guofu Hydrogen Energy Technology Equipment Co., Ltd. and Inner Mongolia Mengfa Guofu Hydrogen Energy Technology Co., Ltd. joined hands with the People's Government of Siziwang Banner, Ulanqab City to jointly sign an important agreement. The three parties will combine their respective advantages to jointly promote the construction of integrated wind and solar green hydrogen production and liquefaction projects. The total investment of the project is expected to reach about 5 billion yuan, and it is planned to be implemented gradually in three phases. Once the project is completed, its hydrogen production capacity will reach 120 tons per day, with an annual production capacity of approximately 40,000 tons, and it is expected to become the leading green hydrogen production base in the region. In terms of core facilities, the project will be equipped with 60 electrolyzers with a capacity of 1,000 cubic meters per hour, a hydrogen liquefaction system with a daily processing capacity of 120 tons, and complete hydrogen storage facilities. At the same time, the entire process will be equipped with equipment such as water electrolysis hydrogen production, hydrogen purification, automated control system, and liquid hydrogen storage and loading.